Customization: | Available |
---|---|
Processing Object: | Metal |
Molding Style: | Forging |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No | Name | Unit | EHU -2/0.5 | EHU -3/1 | EHU -4.3/1.2 | EHU -7.7/2.8 | |
1 | Maximum upsetting force | KN | 20 | 30 | 43 | 77 | |
2 | Maximum clamping force | KN | 5 | 10 | 12 | 28 | |
3 | Maximum stroke of upsetting rod | mm | 200 | 250 | 300 | 400 | |
4 | Maximum stroke of hammering block | mm | 60 | 100 | 100 | 150 | |
5 | Diameter of upsetting rod | mm | 5~8 | 9~12 | 13~16 | 17~25 | |
6 | Maximum length of upsetting rod | mm | 250 | 400 | 600 | 800 | |
7 | Minimum length of forging after upsetting | mm | 60 | 80 | 100 | 120 | |
8 | Heating transformer |
Capacity | KVA | 30 | 50 | 70 | 120 |
Primary voltage | V | 380 | 380 | 380 | 380 | ||
Secondary voltage | V | 2.9 | 2.9 | 2.9 | 3.3 | ||
9 | Efficiency | Heating length | mm | 100 | 150 | 100 | 250 |
Upsetting time per piece | S | 3~6 | 10~12 | 18~20 | 25~35 | ||
10 | Power of power system | KW | ~4 | ~5.5 | ~7.5 | ~11 | |
11 | Gross weight | Kg | ~2000 | ~2500 | ~3000 | ~4000 |