Electric Upsetting for Valve Rod of Generator

Product Details
Customization: Available
Processing Object: Metal
Molding Style: Forging
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14000
OEM/ODM Availability
Yes
  • Electric Upsetting for Valve Rod of Generator
  • Electric Upsetting for Valve Rod of Generator
  • Electric Upsetting for Valve Rod of Generator
  • Electric Upsetting for Valve Rod of Generator
  • Electric Upsetting for Valve Rod of Generator
  • Electric Upsetting for Valve Rod of Generator
Find Similar Products

Basic Info.

Model NO.
Electric Upsetting for Valve Rod of Generator
Molding Technics
Heat Forming
Application
Auto Parts
Material
Steel
Heat Treatment
Quenching
Surface Treatment
Sand Blasting
Forging Tolerance
+/-0.5mm
Standard
GB
Certification
CE, ISO 9001:2008
Maximum Upsetting Force (kN)
20-77
Maximum Clamping Force (kN)
5-28
Maximum Stroke of Upsetting Rod (mm)
200-400
Maximum Stroke of Hammering Block (mm)
60-150
Diameter of Upsetting Rod (mm)
5-25
Maximum Length of Rod (mm)
250-800
Minimum Length of Forging After Upsettin
60-120
Key Word -1
Valve Plunger Electric Upsetting
Key Word -2
Electric Upsetting for Valve Rod of Generator
Key Word -3
Electric Heat Header
Key Word -4
Valve Plunger Upsetting
Key Word -5
Upset Forging Machine
Key Word -6
Valve Rod Upsetting Machine
Key Word -7
Valve Rod Pre-Forging
Key Word -8
Xuzhou Forging
Transport Package
Container
Specification
DJ91
Trademark
XUZHOUPRESS
Origin
Xuzhou
HS Code
8462191000
Production Capacity
80 Sets /Year

Product Description


Technical Proposal of Electric upsetting  machine for  valve rod of gasoline generator


1. Application and working conditions :
The electric upsetting machine mainly completes the electric heating and upsetting process before the die forging of valve lifters (upsetting shape is similar to ball shape , garlic shape, cylinder type, round cake type, etc.).  It can also realize the heating upsetting technology of  rod material, tube material and sheet material. 

 
2. Machine conditions :  

Working environment temperature: 0 ~ 40ºC  
Power supply: three-phase four-wire 380V  
Voltage fluctuation range: 380V± 10%  
Hydraulic system medium: 46# anti-wear hydraulic oil 


3. Brief introduction :
The requirements of the upsetting technology for different products can be realized by adjusting the pressure, speed, displacement and transformer output voltage of the upsetting machine. 
The electric upsetting machine can be equipped with automatic feeding system to achieve single automation;  also can be multi - machine connection realize automatic forging production line.


4. Main technical parameters of the machine :

* Provide Customized Personalized Service
No Name Unit EHU -2/0.5 EHU -3/1 EHU -4.3/1.2 EHU -7.7/2.8
1  Maximum upsetting force KN 20 30 43 77
2  Maximum clamping force KN 5 10 12 28
3  Maximum stroke of upsetting rod mm 200 250 300 400
4  Maximum stroke of hammering block mm 60 100 100 150
5  Diameter of upsetting rod mm 5~8 9~12 13~16 17~25
6  Maximum length of upsetting rod mm 250 400 600 800
7  Minimum length of forging after upsetting mm 60 80 100 120
8  Heating
 transformer
 Capacity KVA 30 50 70 120
 Primary voltage V 380 380 380 380
 Secondary voltage V 2.9 2.9 2.9 3.3
9  Efficiency  Heating length mm 100 150 100 250
 Upsetting time per piece S 3~6 10~12 18~20 25~35
10  Power of power system KW ~4 ~5.5 ~7.5 ~11
11  Gross weight Kg ~2000 ~2500 ~3000 ~4000


 Electric Upsetting for Valve Rod of GeneratorElectric Upsetting for Valve Rod of Generator
Electric Upsetting for Valve Rod of Generator
Electric Upsetting for Valve Rod of Generator
Company Introduction

1. R&D and Manufacturing : 

Our factory company was founded in 2003, originated from the state-owned enterprise, which designated by the former Ministry of Industry began in 1958 Xuzhou Metal-forging equipment factory, due to restructuring so a group of technology, production, front-line assembly experienced backbone staff set up this company, followed the R&D and manufacturing experience of old state-owned units, and according to market demands independent research and development, production and sales of forging equipment, mainly to provide special forging equipments customized .

The new large CNC machining center in our factory can meet the boring, milling and grinding processing technology for large forging equipment; Moreover, we are located in the concentrated location of Xuzhou Construction machinery industry group, the township of China's construction machinery, and the hydraulic outsourcing supporting are very abundant, and the efficiency is very high.

Our typical domestic customers are Xuzhou Construction Machinery Group, Haier Group, Hisense Group, Dalian Italy Furmas, Shandong Shifeng Group, etc.;And Exported to the EU which made the auto parts for the German brand cars , exported to ASEAN for Japanese brand cars to auto parts support, exported to the Middle East Iranian truck companies and other industries; The quality of our technology is approved by the market.

If you are interested in visiting our company , very welcome !


2. Products  :

* Mainly Provide Customized PRESSING  /FORGING Solutions according to customer requirements, especially good at Auto S-CAMSHAFT and Auto AXLE SHAFT Forging Solutions  . 
* Customized Hydraulic Press
* Upsetting / Forging Machine
* Auto S-CAMSHAFT Horizontal Forging Solution
* Auto AXLE SHAFT Orbital Forging Solution
* Power Press/ Servo Feeder/ Die Change System& Die


3. Experiences in Exporting :

* More than 10 years of foreign trade export experience, specializing in hydraulic press machine , forging press machine , mechanical press machine and etc .
* The presses already exported to over 20 countries and regions, such as European Union,  ASEAN (Association of Southeast Asian Nations), America, and Africa, and etc.
Customers' trust is our greatest motivation.


4. After-sale Services :

* Both Partied confirming the drawings within one month after the contract signed, within 15 days seller provide the foundation drawings ,spare parts list.
* Provide detailed installing and testing  instructions with photos and videos  , and immediate online guidance .
* If necessary , engineers sent abroad to the buyer's worksite for installing , training , and acceptance,and the buyer will charge the round-trip air tickets,local food accommodation and transportation , and subsidies per person per day .
* Provide free training for buyer's engineer at buyer's worksite.
* The machine quality guarantee period of 12 months .
* If the equipment failure during the warranty, sure response within 2 hours;
* Seller ensure provide long service of life for technical support and repair spare parts , with preferential price .


5. Workshop Site Photo :

Electric Upsetting for Valve Rod of Generator
Electric Upsetting for Valve Rod of Generator
Electric Upsetting for Valve Rod of Generator
Electric Upsetting for Valve Rod of Generator


Welcome to contact us  : 
MellyQI     Director  Manager
XUZHOU PRESS TECHNOLOGY MACHINERY CO., LTD

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier